text.skipToContent text.skipToNavigation

JE6E608TEZ-NB003M

EDGE8® MTP® PRO Jumper  8F, 50 µm multimode (OM3), MTP (non-pinned) to MTP (non-pinned), LSZH, TIA-568 Type-B polarity, no pullilng grip, 3 m

Contact Distributor for Lead Time

You might also be interested in
General Specifications
Product Number JE6E608TEZ-NB003M
EAN Code 4056418104133
Flame Rating LSZH/FRNC
Fiber Category Bend-improved 50 µm MM (OM3)
Cable Assembly Type EDGE8 Jumper
Cable Type Interconnect
Assembly Insertion Loss ≤ 0.5 dB
Standards
RoHS Free of hazardous substances according to RoHS 2011/65/EU
Intermateability TIA/EIA-604-5 / TIA/EIA-604-5
Environmental Conditions
Temperature Range, Installation 0 °C  to  50 °C    (32 °F  to  122 °F    )
Temperature Range, Operation -10 °C  to  60 °C    (14 °F  to  140 °F    )
Design
Fiber Count 8
Polarity TIA-568 Type-B
Mechanical Specifications
Nominal Outer Diameter 2 mm 
Max. Tensile Strength for Installation 220 N
Min. Bend Radius Installation 30 mm
Min. Bend Radius Operation 10 mm
Specifications - Connector A
Polish UPC
Insertion Loss, Max. 0.35 dB
Note: *IL in preconnectorized products is measured in the factory through two mated pairs.
Boot Color Black
Connector Type MTP® (non-pinned)
Ferrule Material Composite
Boot Type Individual
Reflectance < -20 dB
Specifications - Connector B
Insertion Loss, Max. 0.35 dB
Note: *IL in preconnectorized products is measured in the factory through two mated pairs.
Connector Type MTP® (non-pinned)
Ferrule Material Composite
Reflectance < -20 dB
Furcation - Connector A
Leg Length 0 mm
Furcation - Connector B
Leg Length 0 mm
Dimensions
Length 3 m
Cable Weight 9 kg/km
Ordering Information
Units per Delivery 1/1
Slim round 2-fiber interconnect cable

Improves airflow and reduces congestion

 

MTP® PRO connectors

Allows for pinning and poliarity changes in the field

Bend-improved fibre
Allows tighter cable bends for slack storage and routing, less risk of downtime due to pinched or bent cables

Corning® CleanAdvantage™ technology and optimized dust cap

Eliminates the need for scoping and cleaning prior to initial field connection