text.skipToContent text.skipToNavigation

JE8E808GEZ-NA003M

EDGE8® MTP® PRO Jumper  8F, Bend-improved Single-mode (OS2), MTP PRO (non-pinned) to MTP PRO (non-pinned), Plenum, TIA-568 Type-A polarity, no pulling grip, 10 ft

Contact Distributor for Lead Time

You might also be interested in
General Specifications
Product Number JE8E808GEZ-NA003M
Flame Rating LSZH/FRNC
Fiber Category Bend-improved Single-Mode (OS2)
Cable Assembly Type EDGE8 Jumper
Cable Type Interconnect
Assembly Insertion Loss ≤ 0.5 dB
Standards
RoHS Free of hazardous substances according to RoHS 2011/65/EU
Intermateability TIA/EIA-604-5 / TIA/EIA-604-5
Environmental Conditions
Temperature Range, Installation 0 °C  to  50 °C    (32 °F  to  122 °F    )
Temperature Range, Operation -10 °C  to  60 °C    (14 °F  to  140 °F    )
Design
Fiber Count 8
Polarity TIA-568 Type-A
Mechanical Specifications
Nominal Outer Diameter 2 mm 
Max. Tensile Strength for Installation 220 N
Min. Bend Radius Installation 30 mm
Min. Bend Radius Operation 10 mm
Specifications - Connector A
Polish APC
Insertion Loss, Max. 0.35 dB
Note: *IL in preconnectorized products is measured in the factory through two mated pairs.
Boot Color Black
Connector Type MTP® (non-pinned)
Ferrule Material Composite
Boot Type Individual
Reflectance < -20 dB
Specifications - Connector B
Insertion Loss, Max. 0.35 dB
Note: *IL in preconnectorized products is measured in the factory through two mated pairs.
Connector Type MTP® (non-pinned)
Ferrule Material Composite
Reflectance < -20 dB
Furcation - Connector A
Leg Length 0 mm
Furcation - Connector B
Leg Length 0 mm
Dimensions
Length 3 m
Cable Weight 9 kg/km
Ordering Information
Units per Delivery 1/1
Slim round 2-fiber interconnect cable

Improves airflow and reduces congestion

 

MTP® PRO connectors

Allows for pinning and poliarity changes in the field

Bend-improved fibre
Allows tighter cable bends for slack storage and routing, less risk of downtime due to pinched or bent cables

Corning® CleanAdvantage™ technology and optimized dust cap

Eliminates the need for scoping and cleaning prior to initial field connection